lynx   »   [go: up one dir, main page]

IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v83y2003i1p65-84.html
   My bibliography  Save this article

Freezing the master production schedule under single resource constraint and demand uncertainty

Author

Listed:
  • Xie, Jinxing
  • Zhao, Xiande
  • Lee, T. S.
Abstract
No abstract is available for this item.

Suggested Citation

  • Xie, Jinxing & Zhao, Xiande & Lee, T. S., 2003. "Freezing the master production schedule under single resource constraint and demand uncertainty," International Journal of Production Economics, Elsevier, vol. 83(1), pages 65-84, January.
  • Handle: RePEc:eee:proeco:v:83:y:2003:i:1:p:65-84
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(02)00262-1
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to

    for a different version of it.

    References listed on IDEAS

    as
    1. V. Sridharan & William L. Berry & V. Udayabhanu, 1987. "Freezing the Master Production Schedule Under Rolling Planning Horizons," Management Science, INFORMS, vol. 33(9), pages 1137-1149, September.
    2. Zhao, Xiande & Lam, Kokin, 1997. "Lot-sizing rules and freezing the master production schedule in material requirements planning systems," International Journal of Production Economics, Elsevier, vol. 53(3), pages 281-305, December.
    3. T. S. Lee & Everett E. Adam, Jr., 1986. "Forecasting Error Evaluation in Material Requirements Planning (MRP) Production-Inventory Systems," Management Science, INFORMS, vol. 32(9), pages 1186-1205, September.
    4. Joseph D. Blackburn & Dean H. Kropp & Robert A. Millen, 1986. "A Comparison of Strategies to Dampen Nervousness in MRP Systems," Management Science, INFORMS, vol. 32(4), pages 413-429, April.
    5. Kuik, Roelof & Salomon, Marc & van Wassenhove, Luk N., 1994. "Batching decisions: structure and models," European Journal of Operational Research, Elsevier, vol. 75(2), pages 243-263, June.
    6. Gunther, H. O., 1988. "Numerical evaluation of heuristics for the multi-item single-level capacitated lot-size problem," Engineering Costs and Production Economics, Elsevier, vol. 14(3), pages 233-243, September.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Mula, J. & Poler, R. & Garcia-Sabater, J.P. & Lario, F.C., 2006. "Models for production planning under uncertainty: A review," International Journal of Production Economics, Elsevier, vol. 103(1), pages 271-285, September.
    2. Laurent Lim, Lâm & Alpan, Gülgün & Penz, Bernard, 2014. "Reconciling sales and operations management with distant suppliers in the automotive industry: A simulation approach," International Journal of Production Economics, Elsevier, vol. 151(C), pages 20-36.
    3. Lin Wang & Zhiqiang Lu & Yifei Ren, 2019. "A rolling horizon approach for production planning and condition-based maintenance under uncertain demand," Journal of Risk and Reliability, , vol. 233(6), pages 1014-1028, December.
    4. Hartmut Stadtler & Malte Meistering, 2019. "Model formulations for the capacitated lot-sizing problem with service-level constraints," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(4), pages 1025-1056, December.
    5. Sahin, Funda & Powell Robinson, E. & Gao, Li-Lian, 2008. "Master production scheduling policy and rolling schedules in a two-stage make-to-order supply chain," International Journal of Production Economics, Elsevier, vol. 115(2), pages 528-541, October.
    6. Meixell, Mary J., 2005. "The impact of setup costs, commonality, and capacity on schedule stability: An exploratory study," International Journal of Production Economics, Elsevier, vol. 95(1), pages 95-107, January.
    7. Ana Eugenia Romo Gonzalez & Angeles Villalobos-Alonzo, 2017. "Implementation of Transactional Planning Systems for the Plastics Industry," Business and Management Research, Business and Management Research, Sciedu Press, vol. 6(3), pages 1-16, September.
    8. Gregorio Rius-Sorolla & Julien Maheut & Sofia Estelles-Miguel & Jose P. Garcia-Sabater, 2021. "Collaborative Distributed Planning with Asymmetric Information. A Technological Driver for Sustainable Development," Sustainability, MDPI, vol. 13(12), pages 1-23, June.
    9. Malte Meistering & Hartmut Stadtler, 2020. "Stabilized-cycle strategy for a multi-item, capacitated, hierarchical production planning problem in rolling schedules," Business Research, Springer;German Academic Association for Business Research, vol. 13(1), pages 3-38, April.
    10. Qinyun Li & Stephen M. Disney, 2017. "Revisiting rescheduling: MRP nervousness and the bullwhip effect," International Journal of Production Research, Taylor & Francis Journals, vol. 55(7), pages 1992-2012, April.
    11. Narayanan, Arunachalam & Robinson, Powell, 2010. "Evaluation of joint replenishment lot-sizing procedures in rolling horizon planning systems," International Journal of Production Economics, Elsevier, vol. 127(1), pages 85-94, September.
    12. Gansterer, Margaretha, 2015. "Aggregate planning and forecasting in make-to-order production systems," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 521-528.
    13. G. Rius-Sorolla & J. Maheut & S. Estellés-Miguel & J. P. García-Sabater, 2021. "Operations planning test bed under rolling horizons, multiproduct, multiechelon, multiprocess for capacitated production planning modelling with strokes," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 29(4), pages 1289-1315, December.
    14. Slama, Ilhem & Ben-Ammar, Oussama & Thevenin, Simon & Dolgui, Alexandre & Masmoudi, Faouzi, 2022. "Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1183-1198.
    15. Carlos Herrera & Sana Belmokhtar-Berraf & André Thomas & Víctor Parada, 2016. "A reactive decision-making approach to reduce instability in a master production schedule," International Journal of Production Research, Taylor & Francis Journals, vol. 54(8), pages 2394-2404, April.
    16. Hu, Zhengyang & Hu, Guiping, 2016. "A two-stage stochastic programming model for lot-sizing and scheduling under uncertainty," International Journal of Production Economics, Elsevier, vol. 180(C), pages 198-207.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Sahin, Funda & Powell Robinson, E. & Gao, Li-Lian, 2008. "Master production scheduling policy and rolling schedules in a two-stage make-to-order supply chain," International Journal of Production Economics, Elsevier, vol. 115(2), pages 528-541, October.
    2. Narayanan, Arunachalam & Robinson, Powell, 2010. "Evaluation of joint replenishment lot-sizing procedures in rolling horizon planning systems," International Journal of Production Economics, Elsevier, vol. 127(1), pages 85-94, September.
    3. Zhao, Xiande & Lam, Kokin, 1997. "Lot-sizing rules and freezing the master production schedule in material requirements planning systems," International Journal of Production Economics, Elsevier, vol. 53(3), pages 281-305, December.
    4. Meixell, Mary J., 2005. "The impact of setup costs, commonality, and capacity on schedule stability: An exploratory study," International Journal of Production Economics, Elsevier, vol. 95(1), pages 95-107, January.
    5. Kimms, A, 1998. "Stability Measures for Rolling Schedules with Applications to Capacity Expansion Planning, Master Production Scheduling, and Lot Sizing," Omega, Elsevier, vol. 26(3), pages 355-366, June.
    6. Demirel, Edil & Özelkan, Ertunga C. & Lim, Churlzu, 2018. "Aggregate planning with Flexibility Requirements Profile," International Journal of Production Economics, Elsevier, vol. 202(C), pages 45-58.
    7. de Kok, Ton & Inderfurth, Karl, 1997. "Nervousness in inventory management: Comparison of basic control rules," European Journal of Operational Research, Elsevier, vol. 103(1), pages 55-82, November.
    8. Archibald, Thomas W. & Bokkers, Menno B. & Dekker, Rommert & Vliet, Andre van, 1999. "Minimising bins in transmission systems," European Journal of Operational Research, Elsevier, vol. 115(2), pages 380-391, June.
    9. Meyr, H., 2000. "Simultaneous lotsizing and scheduling by combining local search with dual reoptimization," European Journal of Operational Research, Elsevier, vol. 120(2), pages 311-326, January.
    10. Özen, Ulaş & Doğru, Mustafa K. & Armagan Tarim, S., 2012. "Static-dynamic uncertainty strategy for a single-item stochastic inventory control problem," Omega, Elsevier, vol. 40(3), pages 348-357.
    11. Gaetan Belvaux & Laurence A. Wolsey, 2000. "bc --- prod: A Specialized Branch-and-Cut System for Lot-Sizing Problems," Management Science, INFORMS, vol. 46(5), pages 724-738, May.
    12. Sivadasan, Suja & Smart, Janet & Huaccho Huatuco, Luisa & Calinescu, Anisoara, 2013. "Reducing schedule instability by identifying and omitting complexity-adding information flows at the supplier–customer interface," International Journal of Production Economics, Elsevier, vol. 145(1), pages 253-262.
    13. Ghobbar, Adel A. & Friend, Chris H., 2004. "The material requirements planning system for aircraft maintenance and inventory control: a note," Journal of Air Transport Management, Elsevier, vol. 10(3), pages 217-221.
    14. Peidro, David & Mula, Josefa & Jiménez, Mariano & del Mar Botella, Ma, 2010. "A fuzzy linear programming based approach for tactical supply chain planning in an uncertainty environment," European Journal of Operational Research, Elsevier, vol. 205(1), pages 65-80, August.
    15. Alex Bangash & Ramesh Bollapragada & Rachelle Klein & Narayan Raman & Herbert B. Shulman & Donald R. Smith, 2004. "Inventory Requirements Planning at Lucent Technologies," Interfaces, INFORMS, vol. 34(5), pages 342-352, October.
    16. Daniel Thiel, 1998. "Mise en évidence de l'instabilité des modèles de réapprovisionnement continu par une analyse dynamique des systèmes logistiques," Économie rurale, Programme National Persée, vol. 245(1), pages 56-68.
    17. Slama, Ilhem & Ben-Ammar, Oussama & Thevenin, Simon & Dolgui, Alexandre & Masmoudi, Faouzi, 2022. "Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1183-1198.
    18. Thammakoranonta, Nithinant & Radhakrishnan, Abirami & Davis, Steve & Peck, John C. & Miller, Janis L., 2008. "A protocol for the order commitment decision in a supply network," International Journal of Production Economics, Elsevier, vol. 115(2), pages 515-527, October.
    19. Doostmohammadi, Mahdi & Akartunalı, Kerem, 2018. "Valid inequalities for two-period relaxations of big-bucket lot-sizing problems: Zero setup case," European Journal of Operational Research, Elsevier, vol. 267(1), pages 86-95.
    20. Laurence A. Wolsey, 2002. "Solving Multi-Item Lot-Sizing Problems with an MIP Solver Using Classification and Reformulation," Management Science, INFORMS, vol. 48(12), pages 1587-1602, December.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:83:y:2003:i:1:p:65-84. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.
    Лучший частный хостинг